logo_milkthesun
Login
Project Size
3019.68 kWp
Project Type
Development Rights
System Type
Open area space

Sales Price

Price
3366943
Units available from a purchase price of
86702
Price per kWp
1115
Units for divided systems
17 of 39 units
Transaction type

Remuneration

Type of remuneration
EEG revenue
Amount of remuneration
11.6
Remuneration comment
The 1.5 MWh storage system increases economic efficiency by temporarily storing the PV electricity generated and marketing it specifically at the times with the highest yields. This optimises the electricity value and reduces curtailment losses. It is planned to participate in one of the upcoming open-space tenders - probably in December 2025 or March 2026. Based on the expected award value plus the technology bonus, this will result in a remuneration of around 9.3 ct/kWh. The use of the storage system can increase the total remuneration by a further 2 to 3 ct/kWh on average, meaning that a realistic total value of around 11.6 ct/kWh can be achieved.

Operating Costs

Maintenance contract available?
Takeover of maintenance contract necessary?
Operating costs comment
Maintenance and technical management for €6/kWp per year. This includes maintenance for the tracking system, which aligns the module surfaces with the sun every day, and maintenance of the green storage system. Insurance approx. 1.50 €/kWp per year.

Lease Agreement

Type of lease
Annual lease payment
Total lease duration
30 years
Lease duration in base term
20 years
Lease duration in extension option
Lease payment in base term
5 €/kWp p.a.
Lease payment in extension option
5 % of the annual electricity revenue

Technical Data

Specific yield
1238.31 
Yield calculation
PV*SOL
Is the system already decommissioned?

Economic Efficiency

Possible residual yield in EEG period
Gross yield
12.9

Components

Modules
Smart Solar - SS720M12GH-22/WH
Inverters
SolaX Power - X3-MGA-60K-G2
Substructure
Tracking system - P1
Data logger
Plexlog

Location

Street
Haarhausen district, parcel 4
House number
Parcels 2/25, 3/6
Postal code
34582
City
Borken OT Haarhausen
Country
Germany

Sobald Sie das Projekt freigeschaltet haben, werden diese Informationen verfügbar.

Klicken Sie hier, um das Projekt freizuschalten.

Haftungsausschluss: Für den Inhalt dieses Abschnitts und dessen Vollständigkeit ist der Anbieter dieses Projekts verantwortlich.

Sign Contracts Digitally

Unter folgendem Link können Sie die Sign Contracts Digitally. Ein Muster der Contractse zu dieser Anlage können Sie im Datenraum (weiter oben) herunterladen. So haben Sie die Möglichkeit, den Vertrag ausführlich durchzulesen. Sobald Sie zur Vertragsunterzeichnung fortschreiten möchten, klicken Sie auf den folgenden Button. Sie benötigen dazu eine Kopie Ihres Personalausweises / Reisepass sowie einen Kapitalnachweis über die Kaufpreissumme und ggf. eine Financingszusage.
Sign contracts bindingly now
crossmenu Cookie Consent with Real Cookie Banner